What a court actually costs.

Nobody can price a court from a web page, but you can understand what moves the number before anyone visits. Here is what actually drives it.

Get a quote
The short answer

It depends on the ground, not on the game

Two identical pickleball courts, one in a flat back garden and one on a slope with a drainage problem, are not the same job and will never be the same price. Most of what you pay for a new court is the part nobody sees: excavation, base, drainage and slab. The colour you pick costs almost nothing by comparison.

That is also why we do not publish a price list. A number on a web page that ignores your site is a number you will be talked out of later. What follows is what actually moves the figure, so you can look at your own ground and know roughly what you are in for before anyone visits.

Cost drivers

The six things that move the number

Site preparation

A flat, well-drained, accessible pad is the cheapest court you will ever build. A slope, a wet spot, ledge, or a garden a truck cannot reach are the four things that most often double a budget.

Base and slab

Asphalt or post-tensioned concrete. Post-tension costs more up front and is the reason a court is still crack-free in twenty years. On unstable soils it is not really optional.

Court count and size

Each additional court sharing a pad is meaningfully cheaper than the first — the crew, the mobilisation and the base work are already there. Two pickleball courts are nowhere near twice one.

Surfacing system

A standard acrylic colour coat, or a cushioned system with rubber layers underneath. Cushioned costs more and is what players feel in their knees, which is why clubs choose it and backyards often do not.

Fencing, nets and lighting

Fence height, gates, windscreen, net posts and LED lighting are usually quoted as separates. Lighting is the single most common line people forget until the first evening they cannot play.

Access and distance

Islands, gated communities, narrow drives and long hauls carry real cost — ferry bookings, smaller equipment, extra days. We would rather show you that line than bury it.

Resurfacing

Most courts do not need replacing

If the slab underneath is sound, resurfacing costs a fraction of a new build and buys years. Crack repair, a levelling course and a fresh colour coat will make a fifteen-year-old court play like a new one. Replacement is for a base that has failed — heaving, settling, or cracking faster than it can be filled. We will tell you which one you have, and we have talked plenty of people out of the expensive answer. More on resurfacing and repair.