Martha's Vineyard Estate Tennis Court

Martha's Vineyard Residential Estate

A luxury residential tennis court installation designed to withstand the unique challenges of coastal New England. This custom court combines premium materials with environmental compliance to create the perfect playing surface for an estate setting.

Project Overview

The Martha's Vineyard Estate required a tennis court that could handle one of the most challenging environments in the Northeast: coastal salt air, humidity, and variable weather patterns. We designed and installed a comprehensive solution featuring a specially formulated marine-grade acrylic system that provides exceptional durability while maintaining optimal playing characteristics.

The court's location, perched on an elevated portion of the estate, presented unique drainage and environmental considerations. Our team conducted extensive site analysis to ensure proper water management, prevent pooling, and maintain the estate's environmental compliance with local wetland regulations.

Every aspect of this installation was tailored to the luxury residential context. From the aesthetic integration with the landscape to the material selection that would withstand salt spray and humidity without compromising play quality, this project represents the pinnacle of custom court construction.

Engineering Challenges & Solutions

Salt Air Corrosion

Marine-grade acrylic formulation with specialized UV inhibitors and salt-resistant polymers to prevent deterioration and discoloration.

Drainage Management

Advanced subsurface drainage system with perforated pipes and gravel layers to manage coastal rainfall and groundwater.

Environmental Compliance

Permeable surface design and runoff filtration system that meets Massachusetts wetland protection requirements.

Foundation Stability

Reinforced concrete base with frost-protected footings designed for New England's freeze-thaw cycles and coastal soil conditions.

Construction Timeline

Phase 1: Site Preparation (Weeks 1-2)

Comprehensive site survey, geological analysis, and environmental permit finalization. Excavation and foundation preparation with specialized grading to ensure proper drainage patterns.

Phase 2: Base Installation (Weeks 3-5)

Installation of subsurface drainage systems, gravel base layers, and reinforced concrete court foundation. Curing time and surface leveling verification to specifications.

Phase 3: Acrylic Application & Finishing (Weeks 6-8)

Multi-coat marine-grade acrylic application, line painting with championship specifications, and installation of final accessories including net posts and signage.

Ready to Build Your Court?

Contact us to discuss your residential or commercial court project. We'll help you find the perfect surface solution for your facility and environment.

Start Your Project